We are a leading Manufacturer ofblockmaking machine,block making machinery, concrete block machine, brick making machine,cement blockmachine, paver brick machine, curbstone brick machine, hollow block machine, cement block making machine, for many years. Price: USD35000 USD55000, Fob Xiamen port, China Main technology characters We can supply our customer for designning, production, installation, commissioning, training and good after-sale service. Capacity: from 50000 cubic meter to 300,000 cubic meters per year. Equipments: stocking raw materials, mixing, molding, forming, cutting, evaporating and curing, crane cramp, transporting etc., 1 Product weight is according to 600kg/m3 to control. 2 annual capacity 300,000M3. 3 set raw material proportion: cement 6.5%, raw lime 23%, flyash 68%, gypsum 3%, aluminum paste powder 350g/M3. 4 water and material rate 0.631 5 one mould product 2.88M3 6 Casting slurry cycle time 5-6 minutes, cut cycle time 5 minutes. 7 casting slurry temperature 38-42 degree 8 body quiet stop. Time is 1.5-2.5hours, temperature 50-90 degree, after quiet stop body strength is 0.15-0.18Mpa 9 Steam curing cycle time, come in and out autoclave about 0.5hour, steam curing cycle time about is 7 hours/1.2Mpa total 7.5 hours 10. Cement lime fly ash style aerated block raw material proportion name unit Cement lime fly ash flash % 65-70 cement % 6-15 lime % 18-25 gypsum % 3-5 Aluminum powder paste(600kg/m3) 1/10000 8 Water & material rate 0.60-0.65 Casting system OC 36-40 Aluminum mixing time S 30-40 11. Cement lime Sand style aerated block raw material proportion Name Unit Cement Lime Sand Sand % 55-65 Cement % 10-20 Lime % 20-30 Gypsum % 2-3 Aluminum powder paste(600kg/m3) 1/10000 8 Water & material rate 0.65-0.75 Casting system OC 35-38 Aluminum mixing time S 30-40 Reference: cement is 42.5 Portland or 42.5 common cement Aluminum power paste calculate to use according to 600kg/m3 Remark: the accurate batching rate is adjustable according to the raw material locally